West Creek Concrete Works - Toowoomba

  • Volume of Concrete: 300m3
  • Peak crew size: 6
  • Value $250,000

  • A drain base with a low flow area, weirs and side walls was constructed in Toowoomba city as part of a beautification and flood mitigation project.

Civil Construction