Fire Water Main Upgrade - Winstanes

  • Volume of Concrete: 120m3
  • Peak crew size: 4
  • Value $200,000

  • A fire fighting ring main upgrade at a BP fuel storage facility included 2 tank bases, a pump and valve shed and several bored pier footings.

Civil Construction